In 2022, I came across an ad for a Bridgeport mill. I'd been wanting one, so I went to see the guy. He was a nice, older man who was moving away and wanted to see his tools go to a good home. I visited several times, trying to figure out if I wanted it and how the heck I was going to move it. The machine weighs close to 2000 pounds. Luckily, it comes apart, but even still it was quite a chore.

The Bridgeport before it moved, in the prior owner's garage.

./before.jpg

The first move (August to October 2022)

On August 27, 2022 I cleared out the area under the deck so I could move mill parts through it. As you can see, it was a bit of a job.

./clear-the-way.jpg

Attachment point for the chain hoist, installed. I never should have used that eye bolt: a forged eye bolt would have been much better from a load standpoint.

./hoist-point.jpg

A trivial test of the chain hoist: a bucket.

./hoist-test.jpg

Several pieces I moved myself, with various hoists. On September 3 I built a gantry (it has its own page) so I could take the top of the mill apart with a chain hoist. Here it is over the mill.

./gantry-at-old-spot.jpg

The same gantry from another angle, lifting the ram off the base.

./gantry-from-side.jpg

Two stills from a video of the head coming down, in its lifting straps with a wooden bar through them.

./2022-head-in-straps.jpg

./2022-head-on-cradle.jpg

The head, in lifting straps and hanging from an engine crane over a plywood sled.

./head-on-sled.jpg

The head being lowered under the deck with the chain hoist.

./lowering-piece.jpg

The table on the lift cart in the driveway, having just come out of the car.

./table-on-cart.jpg

And the scissor-lift cart carrying the table, hanging from the same hoist. It was easier just to lower the whole thing rather than unstrap it from the cart.

./table-on-hoist.jpg

And done. And I mean done. I'm paying someone else to move the rest.

./table-in-shop.jpg

Moving day (September 12, 2022)

Moving day was September 12, and the movers did the rest. Plywood laid down as a road for the heavy load.

./plywood-road.jpg

Carrying a piece wrapped in a moving blanket along the plywood.

./carrying-blanket.jpg

Moving the pedestal, the heaviest piece by far at around 900 pounds.

./2022-hand-truck.jpg

The moving truck.

./moving-truck.jpg

./2022-across-the-lawn.jpg

./2022-up-the-lawn.jpg

At the foot of the deck stairs.

./at-the-stairs.jpg

And a short clip of the movers carrying a piece along the side of the house.

./2022-in-the-shop.jpg

./2022-parts-on-floor.jpg

Putting it back together

The column, standing in the basement shop.

./column-in-shop.jpg

The chain hoist on the ceiling, ready to lift the ram back into place.

./2022-column-and-head.jpg

And the gantry, in the basement shop, ready to lift the knee.

./gantry-in-shop.jpg

./2022-gantry-and-column.jpg

I decided to use the gantry for the ram after all, since it has wheels and it was easier to maneuver it into place that way.

./2022-gantry-head.jpg

On October 8 I took the lubricator apart.

./2022-lubricator-1.jpg

./2022-lubricator-2.jpg

./2022-lubricator-3.jpg

Turning the crank, a few days after it was back together.

./2022-table-on-cart.jpg

The head hanging from the chain hoist, above the column.

./head-over-column.jpg

By mid-October the mill was back together.

./back-together.jpg

The first drilling on the reassembled mill.

And the new DRO working.

November 20: I got my workbench cleared out and the mill pivoted, so it's no longer blocking traversal through the shop, at least when the table isn't too far to the left.

./pivoted.jpg

Cleaning up the table (September 2022)

In September 2022 I started to clean up the table on my Bridgeport mill. It'll probably take a few sessions, but here's the "before".

./rebuild-before.jpg

The table is lying on the workbench, long and rusty, with its T-slots running down its length.

Upgrades after the move (fall 2022)

I was still in "get the mill fully restored" mode, so the next jobs were the upgrades that make it pleasant to use. The first was a digital readout. This is the DRO, still in its wrapper, with its first screen.

./2022-dro-in-wrapper.jpg

And mounted on its arm.

./2022-dro-mounted.jpg

The scales' cables run down the side of the mill.

./2022-dro-cables.jpg

Next, a power feed for the Z axis, so I don't have to crank a 600 pound knee up and down by hand. This is the mounting ring for it, plasma cut and then drilled and tapped.

./2022-power-feed-ring.jpg

The Z power feed, installed and running.

The second move (July 2025)

In the summer of 2025 I rearranged the whole basement shop and the mill had to move to a new room. The hydraulic lift cart that made it easy to take the table off appeared to have given up the ghost, but I could still lift things with the shop crane.

The Bridgeport, still in its old spot, with a tub on the table.

./2025-before.jpg

The table, lifted with the shop crane.

./2025-table-up.jpg

The table hanging from the crane.

./2025-table-crane.jpg

The table on its cart, going through the doorway.

./2025-table-doorway.jpg

The table in the new room.

./2025-table-new-room.jpg

The base was the hard part. I started out using a trick where you lift the Bridgeport by cranking the knee down with a board wedged under it, but switched to using a toe jack, which just felt a bit more controlled. With one side tipped up, I put some electrical conduit that I'd cut up underneath it, and I could actually roll it just by pushing on it.

First attempt, using the knee.

./2025-base-on-pipes.jpg

Closer.

./2025-base-conduit.jpg

The base up on the rollers. I can move it easily by myself using a crowbar when it's on these.

./2025-conduit-rollers.jpg

The base coming down the hall. A little help from my friend Andrew.

./2025-hallway.jpg

Things went well with Andrew's help, but honestly the whole thing went so well all that did was speed me up a bit. Once it's up on pipes it's easy to move: just stick a crowbar under it and you can lever it around, an inch at a time. Which was great, because I wasn't sure I liked where it was, and it turned out I could move it a few feet by myself.

In the new room, more or less.

./2025-arrived.jpg

And then a second, shorter move, into the corner, on July 13.

./2025-corner.jpg